Pharos Gully project

As noted in previous report, a temporary track was created by the project team when we were transporting rocks up the gully. The intention was always to rehab this when the time came. Over the years of the project, the track which runs parallel to the official track from the carpark, has become much used and therefore now resembles a fully fledged track. On the 5th May, Walter Braun and a crew from the WCMA drought team worked on the track to take it back to its original form – bush. A fantastic job that looks like there was never a track there in the first place. This temporary track was used for works access for the main project and with this final piece of work, the project is complete. Thanks once again all for the work done and for Walter and the drought team for ticking off the last box. A great collaborative project between Parks Victoria, VCC/CliffCare and Friends of Arapiles.

And the final photos showing before and afters:

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s